Project Type: New building
Project Description: construction of new 5 story, 4-unit building (MID-2008)
Status: Stalled construction site, excavation backfilled
Background: The project was initiated in 2007. The demolition damaged the walls and chimney of the adjacent home, and water seeped into the basement. A Stop Work Order was issued in April 2008. The excavation was backfilled. Violations were issued due to site safety and damaged fencing. In July 2009 the site was declared Stalled and noted as abandoned.
An Emergency Declaration was issued 8/24/2009 to grade and fence the site, noting “Open Unbraced Foundation Past the Point of Influence.” The site was classified as unsafe for months. The owner was non-compliant. The work was completed by HPD and the site was found safe 1/12/2010.
All permits are expired.
Who and why were they permitted to build 3 stories higher than the neighboring buildings? (they aren't on a corner)